Registered User Joined: 6/6/2011 Posts: 9
|
I would like to create a sort column in my my watchlist. I am using a 20 period SMA based on an hourly chart. I have the "Add Column" window up. What does the "Period" parameter refer to?
|
Worden Trainer
Joined: 10/7/2004 Posts: 65,138
|
The Period is based on Bars. So if you have an Hourly Chart, the Period would be 20 of those Hourly Bars.
-Bruce Personal Criteria Formulas TC2000 Support Articles
|