Registered User Joined: 10/7/2004 Posts: 9
|
Looking for a PCF for the EXP Moving Avg 9 crossing up, when the MACD 12 26 is below 0, and also crossing down when the MACD 12 26 is above 0.
|

 Worden Trainer
Joined: 10/7/2004 Posts: 65,138
|
QUOTE (Tradebanger) Looking for a PCF for the EXP Moving Avg 9 crossing up, when the MACD 12 26 is below 0...
Exponential MACD 12,26,9 Signal Line crossing up through raw MACD while raw MACD is below zero:
XAVG(XAVGC12,9) - XAVG(XAVGC26,9) > XAVGC12 - XAVGC26 AND XAVG(XAVGC12.1,9) - XAVG(XAVGC26.1,9) <= XAVGC12.1 - XAVGC26.1 AND XAVGC12 < XAVGC26
QUOTE (Tradebanger) ...and also crossing down when the MACD 12 26 is above 0.
Exponential MACD 12,26,9 Signal Line crossing down through raw MACD while raw MACD is above zero:
XAVG(XAVGC12,9) - XAVG(XAVGC26,9) < XAVGC12 - XAVGC26 AND XAVG(XAVGC12.1,9) - XAVG(XAVGC26.1,9) >= XAVGC12.1 - XAVGC26.1 AND XAVGC12 > XAVGC26
Understanding MACD
How to create a Personal Criteria Forumula (PCF)
PCF Formula Descriptions
Handy PCF example formulas to help you learn the syntax of PCFs!
-Bruce Personal Criteria Formulas TC2000 Support Articles
|