Welcome Guest, please sign in to participate in a discussion. Search | Active Topics |

Profile: schwab.richard
About
User Name: schwab.richard
Groups: Gold User, Member, TeleChart
Rank: Registered User
Real Name:
Location
Occupation:
Interests:
Gender: Gender:
Statistics
Joined: Sunday, April 4, 2010
Last Visit: Sunday, March 1, 2015 9:45:47 AM
Number of Posts: 2
[0.00% of all post / 0.00 posts per day]
Avatar
Last 10 Posts
Topic: PCF %B*Bandwidth
Posted: Sunday, January 1, 2012 10:32:56 AM

I am incorrect (missed a set of "()" in the formula). In the end I used:

(C - (AVGC20 - 2 * SQR(ABS(C ^ 2 + C1 ^ 2 + C2 ^ 2 + C3 ^ 2 + C4 ^ 2 + C5 ^ 2 + C6 ^ 2 + C7 ^ 2 + C8 ^ 2 + C9 ^ 2 + C10 ^ 2 + C11 ^ 2 + C12 ^ 2 + C13 ^ 2 + C14 ^ 2 + C15 ^ 2 + C16 ^ 2 + C17 ^ 2 + C18 ^ 2 + C19 ^ 2 - 20 * AVGC20 ^ 2) / 20))) / (4 * SQR(ABS(C ^ 2 + C1 ^ 2 + C2 ^ 2 + C3 ^ 2 + C4 ^ 2 + C5 ^ 2 + C6 ^ 2 + C7 ^ 2 + C8 ^ 2 + C9 ^ 2 + C10 ^ 2 + C11 ^ 2 + C12 ^ 2 + C13 ^ 2 + C14 ^ 2 + C15 ^ 2 + C16 ^ 2 + C17 ^ 2 + C18 ^ 2 + C19 ^ 2 - 20 * AVGC20 ^ 2) / 20))

I wanted to get this one right, as I intend to use adaptations of the PCF to calculate previous %B values.

Regret inconvenience.

Rick S

Topic: PCF %B*Bandwidth
Posted: Sunday, January 1, 2012 2:40:02 AM
QUOTE (Bruce_L)
It would depend on the settings of your Bollinger %B and Bollinger Bandwidth Indicators, but if both are set to 20,2.0, the formula could be written as:

((C - AVGC20) / SQR(ABS(C ^ 2 + C1 ^ 2 + C2 ^ 2 + C3 ^ 2 + C4 ^ 2 + C5 ^ 2 + C6 ^ 2 + C7 ^ 2 + C8 ^ 2 + C9 ^ 2 + C10 ^ 2 + C11 ^ 2 + C12 ^ 2 + C13 ^ 2 + C14 ^ 2 + C15 ^ 2 + C16 ^ 2 + C17 ^ 2 + C18 ^ 2 + C19 ^ 2 - 20 * AVGC20 ^ 2) / 20) / 4 + .5) * 4 * SQR(ABS(C ^ 2 + C1 ^ 2 + C2 ^ 2 + C3 ^ 2 + C4 ^ 2 + C5 ^ 2 + C6 ^ 2 + C7 ^ 2 + C8 ^ 2 + C9 ^ 2 + C10 ^ 2 + C11 ^ 2 + C12 ^ 2 + C13 ^ 2 + C14 ^ 2 + C15 ^ 2 + C16 ^ 2 + C17 ^ 2 + C18 ^ 2 + C19 ^ 2 - 20 * AVGC20 ^ 2) / 20) / AVGC20

Modelling Bollinger Bands (& Standard Deviation) in a TC PCF
PCF Formula Descriptions
Handy PCF example formulas to help you learn the syntax of PCFs!

When I tired to use the above PCF for MSFT the test gave me a 0.03 result instead of a 0.75 reading as indicated by the TC2000 %B 20 2 indicator.  Have I misapplied the PCF?

Rick S