OK ... gotta work each one through myself rather than cut and paste like I did
Thanks
|
Thanks Bruce,
What I intended to do and it doesn't seem to work was join the bits that you have done for me.
For instance
For a "bullish" kind of bar that opens in the top 1/3 goes down or wherever BUT closes in the top 20% I grabbed the first half of the code from
3. 3 * C <= 2 * L + H
added an AND then added code from
2. 5 * C >= 4 * H + L AND H > L
To give the following:
3 * C <= 2 * L + H AND 3 * C >= 2 * H + L AND H > L
Which didn't give me anything
What am I doing wrong?
Ash
|
Hello,
Could I have a PCF for each of the following bars please:
1. Bar that opens in the bottom 1/3 and closes in the top 1/3
2. Bar that opens in the bottom 33% and closes in the top 20%
3. Bar that opens in the top 1/3 and closes in the bottom 1/3
4. Bar that opens in the top 33% and closes in the bottom 20%
I have other ones but should be able to build my own PCF's from what you can provide me with
Thanks in advance
Ash
|
Darn ... forgot to post the formula
Cci 5
(H + L + C - AVGH5 - AVGL5 - AVGC5) * 1000 / 3 / (ABS(H + L + C - AVGH5 - AVGL5 - AVGC5) + ABS(H1 + L1 + C1 - AVGH5 - AVGL5 - AVGC5) + ABS(H2 + L2 + C2 - AVGH5 - AVGL5 - AVGC5) + ABS(H3 + L3 + C3 - AVGH5 - AVGL5 - AVGC5) + ABS(H4 + L4 + C4 - AVGH5 - AVGL5 - AVGC5) + .001)
Cci 25
(H + L + C - AVGH25 - AVGL25 - AVGC25) * 2800 / 3 / (ABS(H + L + C - AVGH25 - AVGL25 - AVGC25) + ABS(H1 + L1 + C1 - AVGH25 - AVGL25 - AVGC25) + ABS(H2 + L2 + C2 - AVGH25 - AVGL25 - AVGC25) + ABS(H3 + L3 + C3 - AVGH25 - AVGL25 - AVGC25) + ABS(H4 + L4 + C4 - AVGH25 - AVGL25 - AVGC25) + ABS(H5 + L5 + C5 - AVGH25 - AVGL25 - AVGC25) + ABS(H6 + L6 + C6 - AVGH25 - AVGL25 - AVGC25) + ABS(H7 + L7 + C7 - AVGH25 - AVGL25 - AVGC25) + ABS(H8 + L8 + C8 - AVGH25 - AVGL25 - AVGC25) + ABS(H9 + L9 + C9 - AVGH25 - AVGL25 - AVGC25) + ABS(H10 + L10 + C10 - AVGH25 - AVGL25 - AVGC25) + ABS(H11 + L11 + C11 - AVGH25 - AVGL25 - AVGC25) + ABS(H12 + L12 + C12 - AVGH25 - AVGL25 - AVGC25) + ABS(H13 + L13 + C13 - AVGH25 - AVGL25 - AVGC25) + .000001)
Cci 50
(H + L + C - AVGH50 - AVGL50 - AVGC50) * 2800 / 3 / (ABS(H + L + C - AVGH50 - AVGL50 - AVGC50) + ABS(H1 + L1 + C1 - AVGH50 - AVGL50 - AVGC50) + ABS(H2 + L2 + C2 - AVGH50 - AVGL50 - AVGC50) + ABS(H3 + L3 + C3 - AVGH50 - AVGL50 - AVGC50) + ABS(H4 + L4 + C4 - AVGH50 - AVGL50 - AVGC50) + ABS(H5 + L5 + C5 - AVGH50 - AVGL50 - AVGC50) + ABS(H6 + L6 + C6 - AVGH50 - AVGL50 - AVGC50) + ABS(H7 + L7 + C7 - AVGH50 - AVGL50 - AVGC50) + ABS(H8 + L8 + C8 - AVGH50 - AVGL50 - AVGC50) + ABS(H9 + L9 + C9 - AVGH50 - AVGL50 - AVGC50) + ABS(H10 + L10 + C10 - AVGH50 - AVGL50 - AVGC50) + ABS(H11 + L11 + C11 - AVGH50 - AVGL50 - AVGC50) + ABS(H12 + L12 + C12 - AVGH50 - AVGL50 - AVGC50) + ABS(H13 + L13 + C13 - AVGH50 - AVGL50 - AVGC50) + .000001)
|
Hello Bruce,
I have found the following cci formulas and would like to modify them for weekly timeframe.
What do I change?
Ash
ALSO ... If I have each one set as a wtchlist column how do I set the sort order for each? Such as col 1 (cci50) highest to lowest THEN col 2 (cci25) hghest to lowest THEN col 3 (cci5) lowest to HIGHESTvalue.
Note the last column is opposite sort
I have searched but can only see how to sort via one column not
highest value, highest value, lowest value
Ash
|
Can you please send me the layouts as well?
|