Registered User Joined: 1/31/2005 Posts: 10
|
Hello, I think that I've been able to do this before, but I can't seem to find out how. I have two charts open - one in a daily time frame, one in a weekly time frame with the symbol linked. When I scroll back in time on either chart, I would like the other chart to track the same. Is there a way of doing this? Thanks
|
Worden Trainer
Joined: 10/7/2004 Posts: 65,138
|
You can link the pointer by selecting Tools | System Settings | Charts | Show pointer date across all chorts, but it is not possible to link the scrolling and/or zoom between charts.
-Bruce Personal Criteria Formulas TC2000 Support Articles
|
Registered User Joined: 1/31/2005 Posts: 10
|
Thanks Bruce. I was aware of the pointer link but wanted both charts to scroll back and forth in time. Perhaps this can be included as a future feature.
|
Worden Trainer
Joined: 10/7/2004 Posts: 65,138
|
Thank you for your suggestion.
-Bruce Personal Criteria Formulas TC2000 Support Articles
|