Registered User Joined: 1/28/2005 Posts: 6,049
|
Id like to put some green/red dots on Bollinger Bands (standard 20,2) when they rise/fall.
So I need some band momentum PCFs along with Upper/Lower Band PCFs.
Thanks
|
Worden Trainer
Joined: 10/7/2004 Posts: 65,138
|
Well the Bollinger Band 20, 2.00 centerline should be rising when:
C > C20
And it should be falling when:
C < C20
There is proabably a more efficient way to write this, but the upper band should be rising when:
AVGC20 + 2 * SQR(ABS(C ^ 2 + C1 ^ 2 + C2 ^ 2 + C3 ^ 2 + C4 ^ 2 + C5 ^ 2 + C6 ^ 2 + C7 ^ 2 + C8 ^ 2 + C9 ^ 2 + C10 ^ 2 + C11 ^ 2 + C12 ^ 2 + C13 ^ 2 + C14 ^ 2 + C15 ^ 2 + C16 ^ 2 + C17 ^ 2 + C18 ^ 2 + C19 ^ 2 - 20 * AVGC20 ^ 2) / 20) > AVGC20.1 + 2 * SQR(ABS(C1 ^ 2 + C2 ^ 2 + C3 ^ 2 + C4 ^ 2 + C5 ^ 2 + C6 ^ 2 + C7 ^ 2 + C8 ^ 2 + C9 ^ 2 + C10 ^ 2 + C11 ^ 2 + C12 ^ 2 + C13 ^ 2 + C14 ^ 2 + C15 ^ 2 + C16 ^ 2 + C17 ^ 2 + C18 ^ 2 + C19 ^ 2 + C20 ^ 2 - 20 * AVGC20.1 ^ 2) / 20)
And falling when:
AVGC20 + 2 * SQR(ABS(C ^ 2 + C1 ^ 2 + C2 ^ 2 + C3 ^ 2 + C4 ^ 2 + C5 ^ 2 + C6 ^ 2 + C7 ^ 2 + C8 ^ 2 + C9 ^ 2 + C10 ^ 2 + C11 ^ 2 + C12 ^ 2 + C13 ^ 2 + C14 ^ 2 + C15 ^ 2 + C16 ^ 2 + C17 ^ 2 + C18 ^ 2 + C19 ^ 2 - 20 * AVGC20 ^ 2) / 20) < AVGC20.1 + 2 * SQR(ABS(C1 ^ 2 + C2 ^ 2 + C3 ^ 2 + C4 ^ 2 + C5 ^ 2 + C6 ^ 2 + C7 ^ 2 + C8 ^ 2 + C9 ^ 2 + C10 ^ 2 + C11 ^ 2 + C12 ^ 2 + C13 ^ 2 + C14 ^ 2 + C15 ^ 2 + C16 ^ 2 + C17 ^ 2 + C18 ^ 2 + C19 ^ 2 + C20 ^ 2 - 20 * AVGC20.1 ^ 2) / 20)
And the lower band should be rising when:
AVGC20 - 2 * SQR(ABS(C ^ 2 + C1 ^ 2 + C2 ^ 2 + C3 ^ 2 + C4 ^ 2 + C5 ^ 2 + C6 ^ 2 + C7 ^ 2 + C8 ^ 2 + C9 ^ 2 + C10 ^ 2 + C11 ^ 2 + C12 ^ 2 + C13 ^ 2 + C14 ^ 2 + C15 ^ 2 + C16 ^ 2 + C17 ^ 2 + C18 ^ 2 + C19 ^ 2 - 20 * AVGC20 ^ 2) / 20) > AVGC20.1 - 2 * SQR(ABS(C1 ^ 2 + C2 ^ 2 + C3 ^ 2 + C4 ^ 2 + C5 ^ 2 + C6 ^ 2 + C7 ^ 2 + C8 ^ 2 + C9 ^ 2 + C10 ^ 2 + C11 ^ 2 + C12 ^ 2 + C13 ^ 2 + C14 ^ 2 + C15 ^ 2 + C16 ^ 2 + C17 ^ 2 + C18 ^ 2 + C19 ^ 2 + C20 ^ 2 - 20 * AVGC20.1 ^ 2) / 20)
And falling when:
AVGC20 - 2 * SQR(ABS(C ^ 2 + C1 ^ 2 + C2 ^ 2 + C3 ^ 2 + C4 ^ 2 + C5 ^ 2 + C6 ^ 2 + C7 ^ 2 + C8 ^ 2 + C9 ^ 2 + C10 ^ 2 + C11 ^ 2 + C12 ^ 2 + C13 ^ 2 + C14 ^ 2 + C15 ^ 2 + C16 ^ 2 + C17 ^ 2 + C18 ^ 2 + C19 ^ 2 - 20 * AVGC20 ^ 2) / 20) < AVGC20.1 - 2 * SQR(ABS(C1 ^ 2 + C2 ^ 2 + C3 ^ 2 + C4 ^ 2 + C5 ^ 2 + C6 ^ 2 + C7 ^ 2 + C8 ^ 2 + C9 ^ 2 + C10 ^ 2 + C11 ^ 2 + C12 ^ 2 + C13 ^ 2 + C14 ^ 2 + C15 ^ 2 + C16 ^ 2 + C17 ^ 2 + C18 ^ 2 + C19 ^ 2 + C20 ^ 2 - 20 * AVGC20.1 ^ 2) / 20)
-Bruce Personal Criteria Formulas TC2000 Support Articles
|