Gold Customer
Joined: 4/12/2008 Posts: 6
|
Hi,
I am transerfering some STock Charts scans over to my Tc2000 software.
Can you verify i have transferred the following correctly?
Stock Charts Scan
[volume > 1 days ago volume * 1 days ago ROC(1) / absval(1 days ago ROC(1)) * -1]
ROC is Rate of change
TC2000 PCF i came up with
V > ((V1 * C-C1) / abs(c-c1 * -1))
Thansk,
Steve
|
Gold Customer
Joined: 4/12/2008 Posts: 6
|
I removed the double quotes.
V > (V1 * C-C1) / abs(c-c1 * -1)
The second condition would =
and [volume > 2 days ago volume * 2 days ago ROC(1) / absval(2 days ago ROC(1)) * -1]
I came up with this. Is this correct?
V > (V2 * C-C2) / abs(c-c2 * -1)
Steve
|
Worden Trainer
Joined: 10/7/2004 Posts: 65,138
|
Here is the way I would write what I am seeing, but I am not quite to the point of understanding what it is supposed to be doing.
V > -V1 * (C1 - C2) / ABS(C2 - C3)
-Bruce Personal Criteria Formulas TC2000 Support Articles
|